AICTE – Grant For Augmenting Infrastructure In North Eastern Region

- Advertisement -

Details

Introduction

a. The scheme (operated hitherto as Special Scheme for NER) provides financial assistance to institutions located in the North East Region for solving water problems in the campus, providing alternative power support and high-speed internet connectivity. This will significantly address the infrastructural problems confronted by students on day to day basis. The Scheme is being implemented through the Indian Institute of Technology– Guwahati.

b. North East India largely has hilly regions where the supply of water is not regular throughout the year and during the dry season, there is no secured water supply in the institutes. Water harvesting projects are supported under the Scheme for assured water even during the dry season.

- Advertisement -

c. Most of the urban and rural areas in North Eastern India are deprived of continuous electricity supply, which not only affects daily life but also imparting of higher technical education. The scheme makes the provision of installations for captive solar power energy; at places where the solar energy is not effective, procurement of generators can be considered. Such support will make the technical institutes function better by meeting the shortage of conventional electricity supply:

d. The availability/ connection of the internet facility is also not up to the desired level in North Eastern Region. To mitigate this problem, funding

for setting up an initial internet connection is considered under the Scheme. Recurring expenditures for the future shall have to be borne by the institution.

- Advertisement -

Objective

To enhance the functional efficiency of the technical institutes located in far-flung areas of North East India, by addressing deficiencies in water, electricity, and internet connectivity on the campuses.

Benefits

The selected institutes will have to complete the sanctioned project as per the following guidelines:

- Advertisement -

Project Name: Solving Water Problems Project

Limit of Funding: ₹ 15,00,000

Duration of Project: 2 years from the date of receipt of the first installment.

Project Name: Power/ Solar Energy Project

Limit of Funding: ₹ 20,00,000

Duration of Project: 6 months from the date of receipt of the fund for the purpose.

Project Name: Internet Connection Project

Limit of Funding: ₹ 5,00,000

Duration of Project: 6 months from the date of receipt of the fund for the purpose.

Disbursement of the Funds

The first installment is an advance of 80% of the sanctioned grant.

The second installment is reimbursement on successful completion of the project and submission of requisite documents by the institute.

Note: If the project is not initiated within six months, the institute shall have to refund the complete grant with accrued interest to AICTE with justification.

Eligibility

a. Government/ Government-aided technical/ engineering colleges/University Departments including Polytechnic Institutes of North East

are entitled to the grant.

b. The institute must be in existence for the last five years.

Application Process

Offline

Step 1: Download and fill out the application form for AICTE-Grant for Augmenting Infrastructure in North Eastern Region (GAINER).

Step 2: Verify that every page of the application form has the signature and stamp of the Head of the Institute.

Step 3: Attach all the essential documents along with the filled application form.

Step 4: Kindly ensure all the information is correct and then sent the Application form along with all the essential documents through registered post/speed post to:

Advisor,

Institutional Development Cell,

All India Council for Technical Education,

Nelson Mandela Marg, Vasant Kunj,

New Delhi-110070

Processing of Proposals

a. Submission of application by the institute.

b. Screening/ scrutiny of applications at Council.

c. Evaluation of applications by the expert committee.

d. The final decision will be taken by the Council, keeping in view the recommendations made by the experts and the availability of funds for the scheme.

e. After the Council’s approval, the Sanction Letter and the first installment of funds for the Project will be sent to the institution.

Documents Required

Essential Documents Required with Application Form:

(To Solve Water Problem in general)

a. Plan/detailed estimates of the project

b. Abstract of the estimates of the project

c. PWD/CPWD rate certificate of the project

d. Conformity with the norms as suggested by the AICTE and the rates are as per CSR of the region.

e. Mode of construction viz. Contract/ Departmentally (at most competitive rates) or Deposit work by the PWD.

f. A certificate from the Principal/ Competent Authority (concerned Secretary, State Government for Technical Education) that expenditure over and above AICTE grant, if any, will be met by the State Govt./ or the college and the construction will not be delayed for want of funds.

Terms and Conditions

a. Annual Progress Report should be submitted in respect of the projects.

b. After completion of the project, a Project Completion Report should be submitted.

c. Utilization Certificate and Statement of Accounts in prescribed proforma, duly audited by the Finance Officer/Account Officer has to be submitted to AICTE before claiming the balance amount as well as on completion of the project.

a. Documentary proof of cost etc. along with the purchase procedure/formalities to be adopted as per the prescribed order formalities indicated in the GFR.

Procurement of Solar power energy equipment/Generator/Internet connection

b. A certificate from the Principal/ Competent Authority (concerned Secretary, State Government for Technical Education) that expenditure over and above AICTE grant, if any, will be met by the State Govt./or the college, and the purchase will not be delayed for want of funds.

- Advertisement -

Stay in Touch

Join our newsletter

Related Articles